top of page
Port Authority Bus Terminal
Structural Modification
LERA worked with PANYNJ to provide a seismic upgrade of this 2-million-sf (186,000-sm) terminal. The project involved strengthening of the existing structure to enhance its seismic stability.
bottom of page